Abstract
The article examines the risks at the pre-investment stage of projects for the construction of residential buildings, since risks are often assessed incorrectly, and some are not identified. During the survey, such risks were identified and prioritized. The analysis of these results was carried out using statistical tests, after which the results were confirmed using case studies. Ongoing research has prioritized risk parameters and identified key risk parameters.
Keywords
construction industry, cost, pre-investment, quality, risk parameters, priority of risk, time.